2.5MW of PowerLoad liquid-cooled load banks, connected directly into a live data hall cooling loop in Slough. Real load, real densities and real-world validation before IT deployment.
A recent commissioning project at Slough took around 2.5MW of PowerLoad kit: liquid-cooled load banks rigged into a live data hall, with the manifold tied directly into the hall's own cooling loop.
Every megawatt a hall promises has to be proven before a single server is installed. That means applying real load, at real densities, through the hall's real cooling infrastructure, and validating the numbers as they come in.
PowerLoad is at DCD Connect London, stand 49, on 16-17 September. Speak to the team about commissioning for your next project.
Every megawatt a hall promises has to be proven before a single server is installed. That means applying real load, at real densities, through the hall's real cooling infrastructure, and validating the numbers as they come in.
PowerLoad is at DCD Connect London, stand 49, on 16-17 September. Speak to the team about commissioning for your next project.